Client:
|
SEC/SOA
|
|
Project name:
|
Bani Malek Distribution Project
|
|
|
Project Description
|
The scope of this work includes, but not limited to, surveying of the entire Bani malek Area, complete engineering and design of Both H.T. 33KV and L.T. 0.231KV distribution lines, and turnkey installation of 33KV overhead line and associated equipment in number of villagest
|
|
Contact:
|
Mr. Ali Misfer
|
|
Telephone:
|
0555757097
|
|
Location:
|
Bani Malek
|
| Start Date:
|
26/07/2005
|
| Completion Date:
|
25/10/2006
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Installation of Distribution Network Overhead and Underground LV. 13.8KV-33KV
|
|
|
Project Description
|
Installation of Distribution Network Overhead and Underground LV. 13.8KV-33KV
|
|
Contact:
|
Mr. Saeed Mohamad
|
|
Telephone:
|
0557403000
|
|
Location:
|
Asir, Albaha, Bisha, Tihama, Jizan & Najran
|
| Start Date:
|
21/02/2004
|
| Completion Date:
|
20/02/2005
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
National Guard
|
|
Project name:
|
Upgrading Power for KKMA
|
|
|
Project Description
|
Replacement of Transformers & switchgears of King Khalid Military Academy.
|
|
Contact:
|
Mr. Mohammed Goaisa
|
|
Telephone:
|
0562897635
|
|
Location:
|
KKMA Riyadh
|
| Start Date:
|
14/05/2005
|
| Completion Date:
|
13/05/2006
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Telecom Company (STC)
|
|
Project name:
|
Power connection for LDN sites
|
|
|
Project Description
|
Supply, Installation, testing & commissioning for the material and equipment required for Connecting power to LDN sites all over the Kingdom
|
|
Contact:
|
Mr. Othman AlGhamdi
|
|
Telephone:
|
0505441420
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
8/12/2004
|
| Completion Date:
|
07/12/2006
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Tabouk Electricity
|
|
Project name:
|
Tabouk S/S No. 7 132/13.8 kV
|
|
|
Project Description
|
- Extension of S/S 2 & 4 with addition of one 132 kV GIS bay at each
- Sub-station along with protection, control & scada system
- Turn key completion of 132/13.8 kV S/S 7
- Construction of 132 kV O.H.L. along with OPGW
|
|
Contact:
|
Sami Alawi
|
|
Telephone:
|
0504553035
|
|
Location:
|
Tabouk
|
| Start Date:
|
1997
|
| Completion Date:
|
1999
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Electricity Corporation
|
|
Project name:
|
Al-Jawf Electrification Project
|
|
|
Project Description
|
- Extension of Al-Jawf central S/S
- Power plant 132 kV GIS extension
- Dawmat Al-Jandal S/S extension 33kV SWGR
- Skaka "B" S/S extension 132 kV GIS 13.8 SWGR
|
|
Contact:
|
Mohamad Mohamad Ali
|
|
Telephone:
|
046222212
|
|
Location:
|
Al-Jawf Region
|
| Start Date:
|
1998
|
| Completion Date:
|
2000
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Electricity Corporation
|
|
Project name:
|
Sub-Station to Interconnection Military City
|
|
|
Project Description
|
- Erection 132/33/13.8 kV outdoor at Misqi
- Extension of 2 bays 132 kV at AHAD RUFFEIDAH
- Erection of 132 kV cable terminations and CVT's in ASIR CPS
|
|
Contact:
|
Bhatti Shahrani
|
|
Telephone:
|
072271111
|
|
Location:
|
Khamis Mushayt
|
| Start Date:
|
1998
|
| Completion Date:
|
2000
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Sceco South
|
|
Project name:
|
Protection Modification and Commission Military City
|
|
|
Project Description
|
Addtional of protection and control panel CVT, CT's for 2 S/S
|
|
Contact:
|
Bhatti Shahrani
|
|
Telephone:
|
072271111
|
|
Location:
|
Khamis Mushayt
|
| Start Date:
|
1998
|
| Completion Date:
|
2000
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WOA
|
|
Project name:
|
Tabouk S/S No.8
|
|
|
Project Description
|
- New 132/13.8 kV S/S
- Upgrading S/S's 2, 4 & 5
- 5 km laying of 132 kV cable
- Scada
- Telecommunication
|
|
Contact:
|
Sami Alawi
|
|
Telephone:
|
0504553035
|
|
Location:
|
Tabouk
|
| Start Date:
|
2000
|
| Completion Date:
|
2003
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-SOA
|
|
Project name:
|
Bisha South S/S
|
|
|
Project Description
|
- New 132/33/13.8 Substation
|
|
Contact:
|
Abdullah Al Ghamdi
|
|
Telephone:
|
072271111 / 1313
|
|
Location:
|
Bisha
|
| Start Date:
|
2002
|
| Completion Date:
|
2004
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-SOA
|
|
Project name:
|
Baha East S/S
|
|
|
Project Description
|
New 132/33/13.8 kV Substation
|
|
Contact:
|
Abdullah Al Ghamdi
|
|
Telephone:
|
072271111- EXT 1313
|
|
Location:
|
Baha East
|
| Start Date:
|
2003
|
| Completion Date:
|
2005
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-SOA
|
|
Project name:
|
Al Aqiq S/S
|
|
|
Project Description
|
New 132/33 kV Substation
|
|
Contact:
|
Abdullah Al Ghamdi
|
|
Telephone:
|
072271111/ 1313
|
|
Location:
|
Aqiq - Baha
|
| Start Date:
|
2003
|
| Completion Date:
|
2005
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Tanouma S/S
|
|
|
Project Description
|
New 132/33/ 13.8 kV Substation
|
|
Contact:
|
Abdullah Al Ghamdi
|
|
Telephone:
|
072271111- -EXT 1313
|
|
Location:
|
Tanouma - Abha
|
| Start Date:
|
2003
|
| Completion Date:
|
2005
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC - SOA
|
|
Project name:
|
Qilwa S/S
|
|
|
Project Description
|
132 kV Capacitor Banks
|
|
Contact:
|
Ali Sultan Al Aatif
|
|
Telephone:
|
0505084511
|
|
Location:
|
Qilwa - Baha
|
| Start Date:
|
2003
|
| Completion Date:
|
2003
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Contract for the Rijal Almaa Distribution Project
|
|
|
Project Description
|
Contractor shall survey, engineer, design 33kV overhead distribution lines and 0.231 KV distribution lines and supply and deliver materials, install, test and commission the 33KV overhead distribution line for villages at the Rijal Almaa
|
|
Contact:
|
Mr. Ali Misfer
|
|
Telephone:
|
0555757097
|
|
Location:
|
Rijal Amaa Project
|
| Start Date:
|
16/04/2006
|
| Completion Date:
|
15/09/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Maintenance of Distribution Network Medium Voltage up to 33KV and Low Voltage(40442055)
|
|
|
Project Description
|
Maintain all activities of maintenance of distribution network medium voltage up to 33KV & low voltage in accordance with the scope of work.
|
|
Contact:
|
Mr. Saeed Mohamad
|
|
Telephone:
|
0557403000
|
|
Location:
|
Southern Operating Areas
|
| Start Date:
|
25/09/2004
|
| Completion Date:
|
24/09/2007
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Jizan CPS-2 S/S
|
|
|
Project Description
|
Construction including - 2 transformers 133 mva 132/33 kv, 24 GIS bay 132kv, 15 feeders bay 33 kv, relay and control panels, AC/DC Panels, telecom panels, battery, chargers, civil.
|
|
Contact:
|
Abdulla Al Ghamdi
|
|
Telephone:
|
07-2271111 ext 1313
|
|
Location:
|
Jizan Area
|
| Start Date:
|
2005
|
| Completion Date:
|
2007
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Al Aqiq S/S
|
|
|
Project Description
|
Reinforcement including - 2 capacitor bank 33kv, 1 battery, relay and control panels, civil.
|
|
Contact:
|
Abdulla Al Ghamdi
|
|
Telephone:
|
07-2319153
|
|
Location:
|
Baha Area
|
| Start Date:
|
2006
|
| Completion Date:
|
2007
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WN
|
|
Project name:
|
Al Haram-2 & MADINAH NORTH S/S
|
|
|
Project Description
|
Reinforcement including - 7 feeders 13.8 kv at haram-2, 4 feeders 13.8 kv at madina north including relay and control panels, telecom panels, civil
|
|
Contact:
|
Ahmed Al - Gohany
|
|
Telephone:
|
04-8615511 EXT 51332
|
|
Location:
|
Madina
|
| Start Date:
|
13/12/2006
|
| Completion Date:
|
13/12/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC - SOA
|
|
Project name:
|
Tanhada S/S
|
|
|
Project Description
|
-33/13.8 KV Extension Project
|
|
Contact:
|
Ali mesfer Assiri
|
|
Telephone:
|
0555757097
|
|
Location:
|
Tandaha - Abha
|
| Start Date:
|
2004
|
| Completion Date:
|
2006
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-SOA
|
|
Project name:
|
Al Zafeer S/S
|
|
|
Project Description
|
-33/13.8 KV Extension Project
|
|
Contact:
|
Ali Mesfer Assiri
|
|
Telephone:
|
0555757097
|
|
Location:
|
Al Zafeer - Baha
|
| Start Date:
|
2004
|
| Completion Date:
|
2006
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (2008 project C-8)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC sites located at Road &Villages - all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr.Ahmad AL-Saraa
|
|
Telephone:
|
0555426098
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
21/8/2005
|
| Completion Date:
|
31/7/2007
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (C7-2007)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426097
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
02/07/2007
|
| Completion Date:
|
02/04/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (9th Expansion)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426097
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
17/10/1425H
|
| Completion Date:
|
17/7/1428H -31/7/2007G
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WOA
|
|
Project name:
|
AL - LITH S/S
|
|
|
Project Description
|
Rienforcement of 33/13.8 kv AL-LITH S/S and interconnection with Sawamlah S/S.
|
|
Contact:
|
Saad Hamad Al Mansoor
|
|
Telephone:
|
02-6538111
|
|
Location:
|
AL -LITH Area
|
| Start Date:
|
5/5/2007
|
| Completion Date:
|
28/7/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (Road&Villages 5th Stage)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC sites located at road & villages-all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426098
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
25/6/1425H-11/8/2004G
|
| Completion Date:
|
17/7/1428H-31/7/2007G
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (8th Expansion-PO2)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426098
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
16/7/1426H
|
| Completion Date:
|
17/7/1428H -31/7/2007G
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (9th Expansion)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426099
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
11/11/2006
|
| Completion Date:
|
10/11/2007
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (Road&Villages 6th Stage)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites located at road & villages-all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426100
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
12/10/2006
|
| Completion Date:
|
11/10/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to 3rd generation Sites
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to STC-3rd Generation sites all over the Kingdom
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426101
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
01/07/2006
|
| Completion Date:
|
30/06/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Construction maintenance,expansion and reinforcement of HV & LV overhead distribution networks up to 35KV(40542010)
|
|
|
Project Description
|
Install,remove,replace and modify overhead distribution facilities for operating voltage up to and including 35KV in accordance
|
|
Contact:
|
Mr.Saeed Mohamad
|
|
Telephone:
|
0557403000
|
|
Location:
|
Asir,Baha,Jazan & Najran
|
| Start Date:
|
02/04/2005
|
| Completion Date:
|
20/02/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Construction maintenance,expansion and reinforcement of HV & LV under ground distribution networks up to 35kv(40542149)
|
|
|
Project Description
|
Install,remove,replace and modify overhead distribution facilities for operating voltage up to and including 35KV in accordance
|
|
Contact:
|
Mr.Saeed Mohamad
|
|
Telephone:
|
0557403000
|
|
Location:
|
Southern Operating Areas
|
| Start Date:
|
17/12/2005
|
| Completion Date:
|
20/02/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Meters reading and bills distribution (40442049)
|
|
|
Project Description
|
Meters reading and bills distribution for SEC consumers in accordance with the scope of work given by SEC
|
|
Contact:
|
Mr.Nasser ALSheerif
|
|
Telephone:
|
0507757182
|
|
Location:
|
Southern Operating Areas
|
| Start Date:
|
24/08/2004
|
| Completion Date:
|
27/09/2007
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudia Post
|
|
Project name:
|
Wasel Project
|
|
|
Project Description
|
Installation of post boxes with programmable RFID
|
|
Contact:
|
Mr.Hamad AL-Deailij
|
|
Telephone:
|
0505519595
|
|
Location:
|
South Region
|
| Start Date:
|
06/09/2006
|
| Completion Date:
|
05/09/2007
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (6th Expansion)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426097
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
17/05/2003
|
| Completion Date:
|
16/05/2005
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (Road 4th stage)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites located at roads-all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426098
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
17/05/2003
|
| Completion Date:
|
16/05/2005
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
saudi Telecom Company (STC
|
|
Project name:
|
Power connection to GSM Sites for Al Jawal (villages 4th stage)
|
|
|
Project Description
|
Supply, Installation, testing and commissioning for the material and equipment required for Connecting power to GSM-STC expansion sites located at villages-all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad ALSaraa
|
|
Telephone:
|
0555426098
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
17/05/2003
|
| Completion Date:
|
16/05/2005
|
| Construction Value (SR):
|
|
|
|
|
|