Client:
|
SEC/SOA
|
|
Project name:
|
Dahran Al Janoub & Al Khaniq S/S
|
|
|
Project Description
|
Reinforcement including - 2 transformers, 50/67 mva, 132/13.8 kv, 12 feeders bay 132 kv, 14 feedersbay 13.8 kv, 4 chargers, 2 batteries, relay and control panels, civil.
|
|
Contact:
|
Abdullah A. Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
Najran Area
|
| Start Date:
|
27/05/2006
|
| Completion Date:
|
26/07/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
KKAB S/S
|
|
|
Project Description
|
Reinforcement including - 3 transformers, 50/67 mva, 132/13.8 kv, 3 neutral earthing resistance, 1 transformers bay 132 kv, 37 feeders bay 13.8 kv, 2 chargers, 1 battery, relay and control panels, civil.
|
|
Contact:
|
Abdullah A. Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
Khamis Mishait
|
| Start Date:
|
15/04/2006
|
| Completion Date:
|
15/03/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Baha East S/S
|
|
|
Project Description
|
Reinforcement including 3 feeders bay 132 kv, 1 capacitor bank, relay and control panels, civil.
|
|
Contact:
|
Abdulla Al Ghamdi
|
|
Telephone:
|
07-2319153
|
|
Location:
|
Baha Area
|
| Start Date:
|
27/05/2006
|
| Completion Date:
|
26/05/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Baish S/S
|
|
|
Project Description
|
Reinforcement including 2 transformers, 133/106/80 mva, 132/33/13.8 kv, 2 earthing transformers, 19 feeders bay 13.8 kv, 2 chargers, 1 battery, relay and control panels, civil
|
|
Contact:
|
Abdullah A. Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
Jizan Area
|
| Start Date:
|
15/04/2006
|
| Completion Date:
|
14/05/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Oukdud S/S
|
|
|
Project Description
|
Reinforcement including 2 transformers, 50/67 mva, 132/13.8 kv, 2 neutral earthing resistance, 22 feeders bay 13.8 kv, 2 chargers, 1 battery, relay and control panels, civil
|
|
Contact:
|
Abdullah A. Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
Najran area
|
| Start Date:
|
15/04/2006
|
| Completion Date:
|
14/05/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Various Reinforcement S/S
|
|
|
Project Description
|
Reinforcement including 2 feeders bay 33kv at sabya s/s, 3 feeders bay 33kv at abuarish s/s, 2 feeders bay 13.8 kv at Jizan town s/s.3 feedersbay 13.8kv at bisha town s/s. 6 feeders bay 13.8 kv at abha east s/s, relay and control panels, civil
|
|
Contact:
|
Abdullah A. Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
Southern Region
|
| Start Date:
|
15/04/2006
|
| Completion Date:
|
14/05/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Jizan Town S/S
|
|
|
Project Description
|
Reinforcement including 2 transformers 133 mva, 132/33/13.8 kv, 2 earthing transformers, 16 feeders bay 13.8 kv, 1 battery, 2 chargers, relay and control panels, scada, civil
|
|
Contact:
|
Abdulla Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
Jizan Area
|
| Start Date:
|
16/12/2006
|
| Completion Date:
|
16/01/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Sabya S/S
|
|
|
Project Description
|
Reinforcement including - 2 transformers 133mva, 132/33/13.8 kv, 2 earthing transformers, 16 feeders bay 13.8 kv, 1 battery, 2 chargers, relay and control panels, scada, civil.
|
|
Contact:
|
Abdullah A. Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
Jizan Area
|
| Start Date:
|
16/12/2006
|
| Completion Date:
|
16/01/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-SOA
|
|
Project name:
|
Baljurashi North S/S
|
|
|
Project Description
|
construction including - 2 transformers50/60 mva, 132/13.8 kv , 2 aux transformers, 4 feeders bay 132 kv, 1 capacitor bank 20 feeders bay 13.8 kv, 1 battery, 2 chargers, relay and control panels, scada, civil
|
|
Contact:
|
Abdullah A. Al Ghamdi
|
|
Telephone:
|
07-2271528
|
|
Location:
|
BALJURASHI
|
| Start Date:
|
16/12/2006
|
| Completion Date:
|
15/09/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-SOA
|
|
Project name:
|
Al Haramain Road S/S
|
|
|
Project Description
|
construction including - 8 GIS bay 132 kv, 3 transformers 60 mva, 132/13.8 kv, 2 aux transformers, 34 feeders bay 13.8 kv, 2 Chargers, 1 battery relay and control panels,ac/dc panels, scada, civil
|
|
Contact:
|
MAGID ALMALIKI
|
|
Telephone:
|
555704881
|
|
Location:
|
Jeddah
|
| Start Date:
|
13/12/2006
|
| Completion Date:
|
13/09/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-SOA
|
|
Project name:
|
alqamariya s/s
|
|
|
Project Description
|
construction including - 8 GIS bay 132 kv, 3 transformers 60 mva, 132/13.8 kv, 2 aux transformers, 34 feeders bay 13.8 kv, 2 Chargers, 1 battery relay and control panels, ac/dc panels, scada, civil
|
|
Contact:
|
MAGID ALMALIKI
|
|
Telephone:
|
555704881
|
|
Location:
|
Taif
|
| Start Date:
|
13/12/2006
|
| Completion Date:
|
13/09/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WN
|
|
Project name:
|
tabouk 1& 7
|
|
|
Project Description
|
Reinforcement including - 12 feeders 13.8 kv at tabouk-1, 10 feeders 13.8 kv at tabouk-7 including relay and control panels, scada, civil
|
|
Contact:
|
AKIL ALATAS
|
|
Telephone:
|
04 - 8615511 EXT 230
|
|
Location:
|
Tabouk
|
| Start Date:
|
13/12/2006
|
| Completion Date:
|
13/08/2008
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WOA
|
|
Project name:
|
AL-AMAL S/S
|
|
|
Project Description
|
New AL-AMAL 110/13.8 KV Substation ( Jeddah Substation and Transmission line Portion )
|
|
Contact:
|
Ali bukhshan
|
|
Telephone:
|
0555525820
|
|
Location:
|
AL-AMAL
|
| Start Date:
|
18/02/2008
|
| Completion Date:
|
17/11/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WOA
|
|
Project name:
|
NUZLA
|
|
|
Project Description
|
New Nuzla -2 100/13.8 kv Substation in Jeddah AREA
|
|
Contact:
|
Ali bukhshan
|
|
Telephone:
|
0555525841
|
|
Location:
|
AL- NUZLA -2
|
| Start Date:
|
18/02/2008
|
| Completion Date:
|
17/11/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WOA
|
|
Project name:
|
ICY 4
|
|
|
Project Description
|
New ICY 4 110/13.8 KV Substation (Jeddah ) ( Substation and Transmission Line Portion )
|
|
Contact:
|
Aiman Yamani
|
|
Telephone:
|
0555530783
|
|
Location:
|
ICY 4
|
| Start Date:
|
18/02/2008
|
| Completion Date:
|
17/11/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC-WOA
|
|
Project name:
|
Al-Shoran
|
|
|
Project Description
|
Construction of new 110/13.8 kv shoran S/S at Madinah
|
|
Contact:
|
Ahmed AL-Gohany
|
|
Telephone:
|
05-56137468
|
|
Location:
|
Al-Shoran
|
| Start Date:
|
29/03/2008
|
| Completion Date:
|
01/07/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Electricity Company Southern Operating Area (SEC-SOA)
|
|
Project name:
|
Al-Birk S/S
|
|
|
Project Description
|
Replenishment of 132/33 KV S/S
|
|
Contact:
|
Plani Swami
|
|
Telephone:
|
05-62345806
|
|
Location:
|
Al-Birk
|
| Start Date:
|
19/08/2008
|
| Completion Date:
|
18/12/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Organization for Industrail Estates & Technology Zones (SOIETZ)
|
|
Project name:
|
132/13.8 KV substation & 132KV D/C OHTL at Jizan industrial Area
|
|
|
Project Description
|
(i) Construction of new 132/13.8kV S/S Including- GIS, Transformers, 13.8kV switchgear, Relay/Control, SCADA, Fire fieghting, HVAC, Cables and civil works
(ii) 8.5km, 132kV D/C OHTL From Kudmi 380/132kV S/S To Jizan Industrial 132/13.8kV S/S
|
|
Contact:
|
Abdullah Al Ghamdi
|
|
Telephone:
|
07- 2271528 07-2271111
|
|
Location:
|
Jizan
|
| Start Date:
|
21/09/1429 H
|
| Completion Date:
|
21/05/1431 H
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Organization for Industrail Estates & Technology Zones (SOIETZ)
|
|
Project name:
|
110/13.8 KV ICY-5 substation & 110 KV OHTL at Jeddah industrial Area
|
|
|
Project Description
|
(i) Construction of new 110/13.8kV ICY-5 S/S Including- GIS, Transformers, 13.8kV switchgear, Relay/Control, SCADA, Fire fieghting, HVAC, Cables and civil works
(ii) 80km, 110kV OHTL between 380/110kV Shoaiba P.P & New 110/13.8kV ICY-5 S/S
|
|
Contact:
|
Mohd. Jamil mannan
|
|
Telephone:
|
02 6537340
|
|
Location:
|
Jeddah
|
| Start Date:
|
12/10/1429H
|
| Completion Date:
|
12/06/1431H
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Electricity Company West Operating Area (SEC-WOA)
|
|
Project name:
|
Construction of New 132 KV Tabuk (5B) S/S
|
|
|
Project Description
|
Construction included 20 GIS 132kV bays along with control and protection scheme , SCADA, AC/DC, Cables and civil works
|
|
Contact:
|
Engr.Nabil G Khushaim
|
|
Telephone:
|
04 8615511
|
|
Location:
|
Tabuk
|
| Start Date:
|
05/11/2008
|
| Completion Date:
|
05/12/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Ministry of Higher Education
|
|
Project name:
|
Hail University
|
|
|
Project Description
|
Construction of New 132/13.8 KV Hail S/S
|
|
Contact:
|
Mohamed Al Hoglain
|
|
Telephone:
|
0555286988
|
|
Location:
|
Hail Area
|
| Start Date:
|
24/03/2009
|
| Completion Date:
|
24/05/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC
|
|
Project name:
|
Addition of Nine (9) 13.8KV U/G Feeder Panels in S/S Nos. 7904.7905.7906 In Hail Area
|
|
|
Project Description
|
Supply, Installation, Testing and Energizing of Nine (9)13.8kV ,400A U/G Fedder Panels in S/S Nos. 7904.7905.7906 In Hail Area
|
|
Contact:
|
Hussain AL Sagoorr
|
|
Telephone:
|
050445669
|
|
Location:
|
Hail Area
|
| Start Date:
|
25/05/2009
|
| Completion Date:
|
25/08/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saline Water Conversion Corporation (SWCC)
|
|
Project name:
|
Power Supply to Pumping Stations of Shuqaiq Phase (2) Water Transmission System, Package – II
|
|
|
Project Description
|
1-Construction of three new GIS 132/13.8 kV S/S at Pumping Stations PSA2, PSA3 and PSA4
2-Construction of three new 33/13.8kV Substations at Pumping Stations PSDJ, PSR1 & PSR2.
3-Extension of two 33kV Switchgear Panels at existing two Substations
|
|
Contact:
|
Hasan Fakeh
|
|
Telephone:
|
05 55768410
|
|
Location:
|
Abha, Jizan, Al-Birk, Samitah
|
| Start Date:
|
6/12/2009
|
| Completion Date:
|
6/6/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
King Khaled University
|
|
Project name:
|
N/A
|
|
|
Project Description
|
- Construction of new 132/13.8kV S/S
- 13.8kV Switchgear building inside King Khaled University
- 132kV DC OHTL to feed King Khaled University, Abha area.
|
|
Contact:
|
N/A
|
|
Telephone:
|
N/A
|
|
Location:
|
Abha
|
| Start Date:
|
16/8/2009
|
| Completion Date:
|
16/8/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Telecom Company (STC)
|
|
Project name:
|
Out side network OSP
|
|
|
Project Description
|
Supply, Installation, testing & commissioning for the material and equipment required for Connecting power to out side network (NGN) all over the kingdom
|
|
Contact:
|
Mr. Abd ulmoti A. Dahlawi
|
|
Telephone:
|
0504012388
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
27/3/1430
|
| Completion Date:
|
26/9/1431
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Telecom Company (STC)
|
|
Project name:
|
Rehabilitation of technical Building
|
|
|
Project Description
|
Supply, Installation, testing & commissioning for the material and equipment required for Connecting power to GSM-STC sites located at Roads & Villages- all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Rajeh
|
|
Telephone:
|
0504720729
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
26/05/2009
|
| Completion Date:
|
25/11/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Saudi Telecom Company (STC)
|
|
Project name:
|
Power connection to GSM Sites for AlJawal (2009 projects (C-9)
|
|
|
Project Description
|
Supply, Installation, testing & commissioning for the material and equipment required for Connecting power to GSM-STC sites located at Roads & Villages- all over the Kingdom through either commercial power or Generators.
|
|
Contact:
|
Mr. Ahmad AlSaraa
|
|
Telephone:
|
0555426098
|
|
Location:
|
Entire Kingdom of Saudi Arabia
|
| Start Date:
|
27/3/1430
|
| Completion Date:
|
26/9/1431
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
Maintenanace of Distribution Network Medium Voltage up to 33KV & Low Voltage
|
|
|
Project Description
|
Maintain all Activities of maintenance of Diistribution network medium voltage up to 33KV & low voltage in accordance with the scope of work.
|
|
Contact:
|
Mr. Mohammed Mansour
|
|
Telephone:
|
0556203330
|
|
Location:
|
Southen Operating Areas
|
| Start Date:
|
8/10/2007
|
| Completion Date:
|
7/10/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
The Unified Contract for Overhead &Under ground Distribution Networks up to 35KV In Jizan Area
|
|
|
Project Description
|
Install, remove, replace and modify overhead distribution facilities for operating voltage up to and including 35KV in accordance
|
|
Contact:
|
Mr. Mohammed Mansour
|
|
Telephone:
|
0556203330
|
|
Location:
|
Southen Operating Areas Jazan
|
| Start Date:
|
09/02/2008
|
| Completion Date:
|
09/02/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
The Unified Contract for Overhead &Under ground Distribution Networks up to 35KV In Assir Area
|
|
|
Project Description
|
Install, remove, replace and modify overhead distribution facilities for operating voltage up to and including 35KV in accordance
|
|
Contact:
|
Mr.Mohamed Mansour
|
|
Telephone:
|
0556203330
|
|
Location:
|
Southen Operating Areas Assir
|
| Start Date:
|
09/02/2008
|
| Completion Date:
|
09/02/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Zain
|
|
Project name:
|
Power Connection to Zain-Telecom sites
|
|
|
Project Description
|
Supply, install, test & commission power connection throughgenerator to Zain Telecom sites, in the Kingdom of Saudi Arabia.
|
|
Contact:
|
Mr.Khalil AlHarith
|
|
Telephone:
|
|
|
Location:
|
Entire Kindom of Saudi Arabia
|
| Start Date:
|
01/04/2009
|
| Completion Date:
|
01/04/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Etihad Etsalat Company (MOBILY)
|
|
Project name:
|
Supply and installation of Skid mtd. Generator
|
|
|
Project Description
|
Supply, install, test & commission power connection throughgenerator to BSC/Telecom Building, on demand, at the designated site in the Kingdom of Saudi Arabia.
|
|
Contact:
|
Mr. Saad Al Shagrawy
|
|
Telephone:
|
0569282789
|
|
Location:
|
Entire Kindom of Saudi Arabia
|
| Start Date:
|
10/27/2009
|
| Completion Date:
|
11/01/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Etihad Etsalat Company (MOBILY)
|
|
Project name:
|
Power Connection to AlDANA Site
|
|
|
Project Description
|
Supply, install, test & commission power connection to AlDanah site
|
|
Contact:
|
Mr. Saad Al Shagrawy
|
|
Telephone:
|
0569282788
|
|
Location:
|
Riyadh
|
| Start Date:
|
01/07/2009
|
| Completion Date:
|
01/11/2009
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
Etihad Etsalat Company (MOBILY)
|
|
Project name:
|
Power Connection to BSC/Telecom Building
|
|
|
Project Description
|
Supply, install, test & commission power connection to BSC/Telecom Building, on demand, at the designated site in th e Kingdom of Saudi Arabia.
|
|
Contact:
|
Mr. Saad Al Shagrawy
|
|
Telephone:
|
0569282787
|
|
Location:
|
Entire Kindom of Saudi Arabia
|
| Start Date:
|
05/06/2008
|
| Completion Date:
|
05/06/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
NATIONAL GUARD HEALTH AFFAIRS KING ABDULAZIZ MEDICAL CITY
|
|
Project name:
|
SCECOIZATION of Medical City
|
|
|
Project Description
|
Connecting SEC power to MC, by laying the necessarycables and transformers erection with all required accessories, removing the old equipment and install new ones to be compatible with SEC power, finish all the civil and electromechanical work to accomodate the new system
|
|
Contact:
|
Mr. Sami AlSaleh
|
|
Telephone:
|
0505778915
|
|
Location:
|
Riyadh
|
| Start Date:
|
01/11/2009
|
| Completion Date:
|
01/05/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
MINISTRY OF DEFENCE AND AVIATION \ AIR DEFENCE
|
|
Project name:
|
SEC POWER SUPPLY FOR ARFAA SITE AT TAIF
|
|
|
Project Description
|
Connecting SEC power to Air defence site in Arfaa (Taif), by supply and installation of the overhaead line, underground cables and transformers with all required equipment andaccessories,preparing all the civil and electromechanical work to accomodate the new system
|
|
Contact:
|
Mr. Mohammed Ghaith
|
|
Telephone:
|
0507520031
|
|
Location:
|
Taif
|
| Start Date:
|
17/10/2009
|
| Completion Date:
|
16/10/2010
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
CONSTRUCTION SUPPLY INSTALLATION FOR 33 KV OVERHEAD IN SOME VILLAGE IN JIZAN VILLAGE 2
|
|
|
Project Description
|
Delivery and Installation of the electric materials and equipment (Poles, Transformers, cables and conductors)to supply the SEC power to the villages of JIZAN VILLAGE 2
|
|
Contact:
|
Mr. Ali Misfer
|
|
Telephone:
|
0555757097
|
|
Location:
|
Jizan - South region
|
| Start Date:
|
28/09/2009
|
| Completion Date:
|
28/09/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
CONSTRUCTION SUPPLY INSTALLATION FOR 33 KV OVERHEAD IN SOME VILLAGE IN ZAHRAN AL GANOUB
|
|
|
Project Description
|
Delivery and Installation of the electric materials and equipment (Poles, Transformers, cables and conductors) to supply the SEC power to the villages of ZAHRAN AL GANOUB
|
|
Contact:
|
Mr. Ali Misfer
|
|
Telephone:
|
0555757097
|
|
Location:
|
ASSIR- South region
|
| Start Date:
|
28/9/2009
|
| Completion Date:
|
28/9/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC/SOA
|
|
Project name:
|
CONSTRUCTION SUPPLY INSTALLATION FOR 33 KV OVERHEAD IN TAREEB VILLAGE
|
|
|
Project Description
|
Delivery and Installation of the electric materials and equipment (Poles, Transformers, cables and conductors) to supply the SEC power to the villages of Tareeb
|
|
Contact:
|
Mr. Ali Misfer
|
|
Telephone:
|
0555757097
|
|
Location:
|
ASSIR- South region
|
| Start Date:
|
28/9/2009
|
| Completion Date:
|
28/9/2011
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC (WOA)
|
|
Project name:
|
Construction of 110/13.8KV AlANDALOS-2 @ Jeddah
|
|
|
Project Description
|
Design, Engineer, Procure, Supply and Deliver All Materials/Equipment to the Work Site Construction, Install, test and commission and put into service in accordance for construction of 110/13.8 AlANDALOS-2 @ Jeddah
|
|
Contact:
|
Saleh M. Al-Onaizan
|
|
Telephone:
|
NA
|
|
Location:
|
Jeddah
|
| Start Date:
|
22/3/2010
|
| Completion Date:
|
20/5/2012
|
| Construction Value (SR):
|
|
|
|
|
Client:
|
SEC (WOA)
|
|
Project name:
|
Construction of 110/13.8KV BANI AL NAJJAR @ MADINAH S/S
|
|
|
Project Description
|
Design, Engineer, Procure, Supply and Deliver All Materials/Equipment to the Work Site Construction, Install, test and commission and put into service in accordance for construction of 110/13.8 BANI AL NAJJAR @ MADINAH S/S
|
|
Contact:
|
Saleh M. Al-Onaizan
|
|
Telephone:
|
NA
|
|
Location:
|
Madina
|
| Start Date:
|
22/3/2010
|
| Completion Date:
|
20/5/2012
|
| Construction Value (SR):
|
|
|
|
|
|