ehv substations

Ongoing projects
Construction of al Bayah 110/13.8kV SS at Taif

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Taif

Start Date:

21-Aug-2016

Comp. Date:

15-Dec-2018

01
Construction of Al Khandama 110/13.8kV SS at Makkah

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

21-Aug-2016

Comp. Date:

15-Apr-2019

02
Construction of Al Wesam 110/13.8kV S/S at Makkah

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

21-Aug-2016

Comp. Date:

15-Feb-2019

03
Construction of Al Sail Road 110/13.8kV SS at Makkah

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

21-Aug-2016

Comp. Date:

15-Dec-2018

04
Construction of Al Osaila 110/13.8kV SS at Makkah

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

21-Aug-2016

Comp. Date:

15-Dec-2018

05
Construction of Al Haram Road 110/13.8kV S/S at Makkah

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

21-Aug-2016

Comp. Date:

15-Dec-2018

06
EXPANSION of 380 KV Substation in Modon-3 Jeddah

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for 380 KV Substation in Modon-3 Jeddah

Location:

Jeddah

Start Date:

21-Jun-2016

Comp. Date:

21-Feb-2018

07
Construction of New Makkah Housing (MKH) 380/110/13.8kV BSP

GIS, Power Transformer, Aux. Transformer with complete HV/MV Power Cable, terminations, AC/DC, Aux. Power Supply, Interlocking, Metering, Control & Protection, SAS & Telecom along with Civil & Mechanical Works & Addition/Modification of Protection.

Location:

Mekkah

Start Date:

27-Dec-2015

Comp. Date:

27-May-2018

08
System Reinforcement – Retirement of Generation at MPS Power Plant – Makkah (S/S Portion)

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

15-Nov-2015

Comp. Date:

30-Oct-2017

09
Construction of Almadinah Almunawarah Housing 110/13.8 KV SIS

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

AlMadinah

Start Date:

13-Nov-2015

Comp. Date:

12-Oct-2017

10
Construction of Tabuk Housing 132/13.8 KV SIS

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for 132/13.8kV Substation

Location:

Tabuk

Start Date:

12-Nov-2015

Comp. Date:

12-Dec-2017

11
Construction of Makkah-2 Housing 110/13.8 KV SIS

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

12-Nov-2015

Comp. Date:

12-Dec-2017

12
“Construction of Makkah-3 Housing 110/13.8 KV SIS”

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

12-Nov-2015

Comp. Date:

12-Dec-2017

13
Construction of 110/13.8 KV AL-Rawabi S/S in Jeddah

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Jeddah

Start Date:

30-Sep-2015

Comp. Date:

30-Oct-2017

14
Construction of 110/13.8 KV Sari S/S in Jeddah

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Jeddah

Start Date:

30-Sep-2015

Comp. Date:

30-Oct-2017

15
Construction of 110/13.8 KV Heraa S/S in Jeddah.

Construction of 110/13.8kv S/S With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Jeddah

Start Date:

30-Sep-2015

Comp. Date:

30-Oct-2017

16
Addition of Power Transformer at Khulais BSP

Installation of 1 transformer and extension work, design,erection and testing workat Taif

Location:

Khulais

Start Date:

30-Sep-2015

Comp. Date:

30-Aug-2017

17
Construction of 2nd Substation 110/13.8 KV with capacity 143 MVA in Modon-3 Jeddah

Construction of 110/13.8kv Modon S/S in Jeddah With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Jeddah

Start Date:

30-Jul-2015

Comp. Date:

29-Jul-2018

18
Construction of MUDAYLIF 132/33kV Substation in Tihama

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for MUDAYLIF 132/33kV Substation in Tihama as per the following described: 13No.s 132KV GIS Bays, 2 No.s 132/33KV 80/100MVA Power TR, 28No.s 33KV SWGR,4No.s 33kV capacitor banks (7MVAR)

Location:

Tihama- KSA

Start Date:

12-May-2015

Comp. Date:

11-Aug-2017

19
Construction of AL-SHABAYN 132/33KV Substation in Tihama

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for AL SHABAYN 132/33KV Substation in Tihama as per the following described:10No.s 132KV GIS Bays, 2 No.s 132/33KV 80/100MVA Power TR, 28No.s 33KV SWGR, 4No.s 33kV capacitor banks (7MVAR)

Location:

Tihama- KSA

Start Date:

12-May-2015

Comp. Date:

11-Apr-2017

20
Construction of GREGAR 132/13.8kV Substation in Asir

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for GREGAR 132/13.8kV Substation in Tihama as per the following described: 12No.s 132KV GIS Bays, 3 No.s 132/13.8KV 50/67MVA Power TR, 44No.s 13.8KV SWGR, 3No.s 13.8kV capacitor banks (5MVAR),

Location:

Asir- KSA

Start Date:

12-May-2015

Comp. Date:

11-Aug-2017

21
Construction of BAREQ 132/33KV Substation in Tihama

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for BAREQ 132/33KV Substation in Tihama as per the following described: 12No.s 132KV GIS Bays, 3 No.s 132/33KV 80/100MVA Power TR, 41No.s 33KV SWGR, 6No.s 33kV capacitor banks (5MVAR)

Location:

Tihama- KSA

Start Date:

12-May-2015

Comp. Date:

11-Aug-2017

22
Extension of QALWAH 132/33KV Substation in Tihama

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for EXTENSION OF QALWAH 132/33KV Substation in Tihama as per the following described: Exentsion of 1 No. 132KV Bay, 4 No.s 33KV SWGR, Extension of RTU, Extension of control system, Extension of Communication system, HV cable terminations,

Location:

Tihama- KSA

Start Date:

12-May-2015

Comp. Date:

11-Aug-2017

23
Construction of Al-Naseem S/S 110/13.8 kV in Makkah

Construction of 110/13.8kv S/S in Jeddah With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Mekkah

Start Date:

02-Apr-2015

Comp. Date:

15-Jun-2017

24
Extension of AL-Qeya SIS 110 33 kV in Taif

Installation of 1 transformer and extension work, design,erection and testing workat Taif

Location:

Taif

Start Date:

02-Apr-2015

Comp. Date:

15-Jun-2017

25
Construction of Al-Khalidiya S/S 110/13.8 kv in Madinah Munawarah

Design, engineer, procure, supply and deliver all materials / equipment to the WORK SITE, construct, install, test and commission and put into service .

Location:

Madhina

Start Date:

11-Jan-2015

Comp. Date:

14-May-2017

26
Construction of new 110/13.8 KV Oum Al Salam2 S/S at Jeddah

Design, engineer, procure, supply and deliver all materials / equipment to the WORK SITE, construct, install, test and commission and put into service .

Location:

Jeddah

Start Date:

11-Jan-2015

Comp. Date:

06-May-2017

27
Construction of new 110/13.8 KV Al-Raudah2 S/S at Jeddah

Design, engineer, procure, supply and deliver all materials / equipment to the WORK SITE, construct, install, test and commission and put into service .

Location:

Jeddah

Start Date:

08-Jan-2015

Comp. Date:

02-Aug-2017

28
Construction of new 110/13.8 KV Al-Thager 2 S/S at Jeddah

Design, engineer, procure, supply and deliver all materials / equipment to the WORK SITE, construct, install, test and commission and put into service .

Location:

Jeddah

Start Date:

08-Jan-2015

Comp. Date:

04-Aug-2017

29
Construction of 110/13.8 kv ss at King Abdul Aziz University

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission at new S/S UN4 and extension of Existing SS UN3 and Under ground cable work between UN4 & UN3 and put into service .

Location:

Jeddah

Start Date:

08-Dec-2014

Comp. Date:

31-Dec-2017

30
Construction of 110/13.8 kv Substation at King Faisal Hospital

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service

Location:

Jeddah

Start Date:

08-Dec-2014

Comp. Date:

30-Jan-2017

31
Construction of Tabouk 380KV BSP

Design, engineer, procure, supply and deliver all materials / equipment to the WORK SITE,construct, install, test and commission and put into service for Construction of Tabouk 380 kv BSP as specified in the respective Scope of Work in Schedule ''B'' and Technical pecifications.

Location:

Jeddah

Start Date:

16-Nov-2014

Comp. Date:

02-Aug-2017

32
Construction of Khamis West 132/33/13.8 KV Substation in Asir

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for Khamis West 132/33/13.8 KV Substation in Asir as per the following described: 2Nos.132/33 kV Power transformer, 3Nos.132/13.8kV Power transformer, 3Nos.13.8kV Capacitor Bank, 4Nos. 33kV Capacitor Bank, 11Nos. Indoor 132kV Switchgears GIS,19Nos. 33kV Switchgear, 40Nos.13.8kV Switchgear AND 1Nos.132kV outdoor breaker at ABHA EAST 380/132kV BSP S/S

Location:

Asir- KSA

Start Date:

21-Jul-2014

Comp. Date:

31-Oct-2016

33
Construction of Al-Quz 132/33KV Substation in Tihama

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for Al-Quz 132/33KV Substation in Tihama as per the following described: 2Nos. 132/33 kV Power transformer, 4Nos. 33kV Capacitor Banks, 11Nos.132KV Switchgear(GIS), 25Nos.33kV Switchgear

Location:

Tihama- KSA

Start Date:

13-Jul-2014

Comp. Date:

09-Apr-2017

34
Construction of Qunfuda North 132/13.8 KV Substation in Tihama

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for Qunfuda North 132/ 13.8 KV Substation in Tihama as per the following described: 3Nos.132/13.8 kV Power Transformer, 3Nos. 13.8kV Capacitor Banks, 13Nos. Indoor 132kV GIS, 42Nos.13.8kV switchgear

Location:

Tihama- KSA

Start Date:

13-Jul-2014

Comp. Date:

01-May-2017

35
Construction of new Modon Madhina 380/110/33/13.8kv Substation

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for Modon Madhina 380/110/33/13.8KV Substation in Madhina as per the PTS

Location:

Madhina

Start Date:

15-Jun-2014

Comp. Date:

30-Dec-2017

36
Construction of New 110/13.8 kV Al-Aziziyah-4 S/S at Makkah Al-Mokramah

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for Al-Azizia 110/13.8KV Substation in Tihama as per the following described: 11Nos.110KV Switchgear (GIS) 3Nos. 50/67MVA 110/13.8 kV Power Transformers 44Nos.13.8kV Switchgear with complete Protection, SAS, SCADA, LDC & Telecom along with Civil & Mechanical Works.

Location:

Mekkah

Start Date:

04-Jun-2014

Comp. Date:

13-Aug-2017

37
Construction of New 110/13.8 kV Al-Misfalah-4 S/S at Makkah Mokramah

Design, engineer, procure, supply and deliver all equipment and materials to the work site, construct, install, test and commission and put into service for Misfalah 110/13.8 KV Substation in Misfalaha as per the following described: 9Nos.110KV Switchgear(GIS) 3Nos. 50/67MVA 110/13.8 kV Power Transformers 44Nos.13.8kV Switchgear with complete Protection, SAS, SCADA, LDC & Telecom along with Civil & Mechanical Works

Location:

Mekkah

Start Date:

04-Jun-2014

Comp. Date:

27-Jun-2017

38
Construction of 110/13.8kv Motamarat S/S

Construction of 110/13.8kv Motamarat S/S in Jeddah With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Jeddah

Start Date:

28-Jan-2014

Comp. Date:

28-May-2016

39
Construction of 110/13.8 kv Gulf Salman S/S in Jeddah

Construction of 110/13.8kv Gulf Salman S/S in Jiddah With Installation & Erection and Complete Testing & Commissioning of GIS, Transformer, SWGR and Control & Protection Panels As Major Scope.

Location:

Jeddah

Start Date:

01-Jan-2014

Comp. Date:

29-May-2016

40
Construction of Tabuk-11 S/S 132/13.8 kv in Tabouk

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service in accordance for construction of 132/13.8 kv Tabuk-11 s/s & at (Tabuk).

Location:

Tabuk

Start Date:

18-May-2013

Comp. Date:

19-Jan-2016

41
Construction of Al-Barakah S/S in Madinah Munawarah 110/13.8 kv

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service in accordance for construction of 110/13.8 kv Al Barakah s/s & at (Madinah).

Location:

Madhina

Start Date:

15-May-2013

Comp. Date:

01-Sep-2016

42
Upgrade Power Transmission System at southern area oil operation (SAOO) in ARAMCO

Upgradation of Transmission System from single circuit to double circuit in 36 location in Ghawar region, perform the design, procurement, fabrication, construction, installation, pre-commissioning, commissioning / startup and incidental WORK.

Location:

Southern area oil operation

Start Date:

19-Feb-2013

Comp. Date:

06-Apr-2016

43
Construction of King Abdullah Sports City 110/13.8 KV Substation

Eleven (11) 110kv GIS bays, Three (3) Power transformers, Three (3) Shunt Capacitors, Power cables & Terminations & install complete Protection, SAS, SCADA, LDC & Telecommunication System along with civil works."

Location:

Jeddah

Start Date:

26-Jan-2013

Comp. Date:

02-Mar-2016

44
Construction of Tathleeth 132/33 kV Substation

Design, engineer, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and/or tools to the work site and company designated warehouse (s) respectively, construct, install, test and commission and put into service

Location:

Tathleeth

Start Date:

22-May-2012

Comp. Date:

13-Jan-2016

45
Completed projects
Construction of Al-Mashaer S/S 380 kv

Construction of a new indoor type 380/110/13.8kV GIS substation named as AL MASHAAR (MHR) 380kV BSP including complete protection, metering, control, communication and SCADA equipment. The new Substation shall be equipped with Substation Automation System (SAS) and will be remotely controlled from the Power Control Center (PCC) through SCADA system,

Location:

Mekkah

Start Date:

08-Jul-2013

Comp. Date:

10-Nov-2015

01
Construction of new 110/13.8 KV Almubda S/S and Ext. of Alzahar S/S at MAKKH AlMUKARAMA

1-Design, Supply, Contraction, Test and Commission of Substations AL-MAABDAH Consisting Of: (9)110 KV GIS SWGR Bays, (44) 13.8 KV Panels, (3) 67/50 MVA 110/13.8 KV (3) & 7 MVAR Capacitor Bank complete with SAS, protection, Telecom and Civil Work. 2- Ext. of 110 KV S/S ALZAHRAA BY ADDING (1) 110 KV Feeders Compete With SCADA, Protection & Control.

Location:

Makah

Start Date:

10-Dec-2012

Comp. Date:

16-Sep-2015

02
Construction of Sharurah PP2 132/33 kv substation and sharurah town 132/33/13.8 kv substation

Engineering and design, procure, supply and deliver all equipment and materials including operational spare parts and special equipment and/or tools to the work site and company designated warehouse(s) respectively, construct, install, test, commission, and put into service SHARURAH PP2 132/33/13.8 KV S/S.

Location:

Sharurah

Start Date:

27-Feb-2012

Comp. Date:

05-Dec-2015

03
Construction of new 132/13.8 kv Debaa-2 S/S at tabuk

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service in accordance for construction of 132/13.8 kv DEBAA-2 s/s & at (Tabuk).

Location:

Tabuk

Start Date:

26-Feb-2012

Comp. Date:

03-Jan-2016

04
Extension of 110/13.8 kv Khaiber S/S at Almadenah almenawarah

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service in accordance for extension of 110/13.8 kv Khaiber s/s at Almadenah Almenawarah.

Location:

Madhina

Start Date:

13-Feb-2012

Comp. Date:

27-Dec-2015

05
Construction of new 380/110/13.8 kV Substation at 3rd industrial Zone Jeddah

Construction of a new indoor type 380/110KV GIS S/S named MODON JEDDAH 380KV BSP including complete protection, metering, control, communication and SCADA equipment. The new S/S shall be equipped with SAS and will be remotely controlled from PPC throw SCADA System, communication system and gateway.

Location:

industrial Zone Jeddah

Start Date:

12-Feb-2012

Comp. Date:

28-Sep-2015

06
Construction of new 110/13.8 KV Alroddaf S/S at taif

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service in accordance for construction of new 110/13.8 kv ALRODDAF s/s.

Location:

Taif

Start Date:

08-Feb-2012

Comp. Date:

31-May-2015

07
Construction of new 110/13.8 kv Aljamoom-2 S/S at Makka Al-mukaramh

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service in accordance for construction of 110/13.8 kv ALJAMOOM-2 s/s at Makkah Almukaramah.

Location:

Makah

Start Date:

07-Feb-2012

Comp. Date:

26-Apr-2015

08
Extension of 110/13.8 KV ICY SS At Al-Madenah Al-Menawarah

Design engineer, procure, supply and deliver all materials /equipment to the work site, construct, install, test and commission and put into service in accordance for extension of 110/13.8 kv ICY s/s at Almadenah Almenawarah.

Location:

Western Sector

Start Date:

29-Jan-2012

Comp. Date:

14-Dec-2015

09
Construction of new Tabuk university power station

Generation power substation and connecting cables to the network ground to feed the complex university faculties at Tabuk university

Location:

Tabuk

Start Date:

05-Jan-2011

Comp. Date:

08-Aug-2015

10
Construction of New 132/13.8 KV Tabuk-10 S/S at King Faisal Air Base Force -KSA

Design, Engineer, Procure, Supply and Deliver All Materials/Equipment to the Work Site Construction, install, test and commission and put into service in accordance for construction of New 132/13.8 KV Tabuk-10 S/S .

Location:

Tabuk

Start Date:

05-Dec-2010

Comp. Date:

21-Apr-2015

11
Construction Of 110/13.8 kv Bani Al Najjar @ Madinah

Design, Engineer, Procure, Supply and Deliver All Materials / Equipment to the Work Site Construction, install, test and commission and put into service in accordance for construction of 110/13.8 BANI AL NAJJAR @ MADINAH S/S

Location:

Madhina

Start Date:

22-May-2010

Comp. Date:

10-Feb-2015

12
Construction Of 110/13.8 kv Al- Andalos-2 @ JEDDAH

Design, Engineer, Procure, Supply and Deliver All Materials/Equipment to the Work Site Construction, install, test and commission and put into service in accordance for construction of 110/13.8 AL ANDALOS-2 @ Jeddah

Location:

Jeddah

Start Date:

22-Mar-2010

Comp. Date:

21-Nov-2013

13
Power Supply to Pumping Stations of Shuqaiq Phase (2) Water Transmission System, Package – II

1-Construction of three new GIS 132/13.8 kV S/S at Pumping Stations PSA2, PSA3 and PSA4
2-Construction of three new 33/13.8kV Substations at Pumping Stations PSDJ, PSR1 & PSR2.
3-Extension of two 33kV Switchgear Panels at existing two Substations

Location:

Khamis Mushuet

Start Date:

06-Dec-2009

Comp. Date:

30-Oct-2012

14
Addition of Nine (9) 13.8KV U/G Feeder Panels in S/S

Supply, Installation, Testing and Energizing of Nine (9)13.8kV ,400A U/G Fedder Panels in S/S Nos. 7904.7905.7906 In Hail Area

Location:

Hail

Start Date:

25-May-2009

Comp. Date:

07-Dec-2010

15
Construction of new 132/13.8 KV substation & 132KV D/C OHTL at Jizan industrial Area

(i) Construction of new 132/13.8kV S/S Including- GIS, Transformers, 13.8kV switchgear, Relay/Control, SCADA, Fire fieghting, HVAC, Cables and civil works
(ii) 8.5km, 132kV D/C OHTL From Kudmi 380/132kV S/S To Jizan Industrial 132/13.8kV S/S

Location:

Jizan

Start Date:

17-Dec-2008

Comp. Date:

09-Jan-2011

16
Construction of New 110/13.8 KV AL-Nuzla2 S/S at Jeddah

New Nazla-2 100/13.8 KV substation in jeddah Area

Location:

Jeddah

Start Date:

26-Nov-2008

Comp. Date:

10-Jun-2012

17
Construction of New 132 KV Tabuk (5B) S/S

Construction included 20 GIS 132kV bays along with control and protection scheme , SCADA, AC/DC, Cables and civil works

Location:

Tabuk

Start Date:

25-Nov-2008

Comp. Date:

01-Jul-2012

18
110/13.8 KV ICY-5 substation & 110 KV OHTL at Jeddah industrial Area

(i) Construction of new 110/13.8kV ICY-5 S/S Including- GIS, Transformers, 13.8kV switchgear, Relay/Control, SCADA, Fire fighting, HVAC, Cables and civil works
(ii) 80km, 110kV OHTL between 380/110kV Shoaiba P.P & New 110/13.8kV ICY-5 S/S

Location:

Jeddah

Start Date:

25-Nov-2008

Comp. Date:

31-Jul-2013

19
Reinforcement of Al-Birk 132/33 KV S/S

Replenishment of 132/33 KV S/S

Location:

Al-Birk

Start Date:

07-Sep-2008

Comp. Date:

06-Feb-2010

20
Construction of Baljurashi North S/S 132/13.8 KV

Construction including - 2 transformers 50/60mva, 132/13.8kv, 2 aux transformers, 4 feeders bay 132kv, 1 capacitor bank 20feeders bay13.8kv, 1battery,2 chargers, relay and control panels, SCADA, civil.

Location:

Baljurashi

Start Date:

03-May-2008

Comp. Date:

29-Dec-2011

21
Construction of new 110/13.8 KV Shoran S/S at madinah Menawarah

Construction of new 110/13.8 KV Shoran S/S at madinah Menawarah

Location:

Madhina

Start Date:

26-Apr-2008

Comp. Date:

03-Jul-2012

22
Construction of New 110/13.8 KV ICY- 4 S/S at Jeddah

New ICY-4 110/13.8KV Substation (Jeddah) (Substation and Transmission Lines Portion)

Location:

Jeddah

Start Date:

12-Mar-2008

Comp. Date:

26-Dec-2010

23
Construction of New 110/13.8 KV AL- Amal S/S at Jeddah

Construction of New Al-amal 110/13.8 KV Substation (Jeddah Substation and Transmission Line Portion)

Location:

Jeddah

Start Date:

12-Mar-2008

Comp. Date:

12-Nov-2012

24
Reinforcement of AL LITH 33/13.8 KV S/S

Reinforcement of 33/13.8 kV AL LITH S/S and interconnection with Sawamlah S/S

Location:

Alith Area

Start Date:

05-May-2007

Comp. Date:

27-Dec-2008

25

mv/lv distribution network

Ongoing projects
Unified Contract for Distribution Networks up to 36KV In Assir Electricity Department (# 4400008841)

Install, remove, replace and modify maintain, MV and LV overhead and underground distribution networks voltage up to 36 KV .

Location:

Southern Operating Areas Assir

Start Date:

01-Dec-2016

Comp. Date:

31-Oct-2018

01
Rental Generators for Nokia Co.

Rental Generators for Nokia Co.

Location:

Entire Kingdom of Saudi Arabia

Start Date:

05-Oct-2015

Comp. Date:

30-Jun-2017

02
Maintenance of distribution network Substation in Southern Region (#4400006723)

Perform all activities of preventive maintenance of substation and isolated stations and perform period maintenance , for network upto 33 KV with labors, equipemnts and tools to acheive the work

Location:

Southern region

Start Date:

01-Oct-2015

Comp. Date:

30-Sep-2018

03
OSP 2016

Work to improve and expand the external network (OSP) for the year 2015

Location:

Entire Kingdom of Saudi Arabia

Start Date:

16-Mar-2015

Comp. Date:

30-Jun-2017

04
Installation of 13.8 KV OHTL and 115 KV Underground power cables.

Installation work , Testing and Commissioning of 13.8 KV OHTL, and laying of 13.8 KV,69 KV and 115 KV Underground power cables related to project Upgrade Power System Transmission at SAOO, Saudi Aramco

Location:

Dammam

Start Date:

15-Aug-2014

Comp. Date:

31-Dec-2015

05
The unified contract for distribution networks up to 36KV In Assir area (#41341005/00)

Install, remove, replace and modify overhead distribution facilities for operating voltage up to and including 36 KV in accordance

Location:

Southern Operating Areas Assir

Start Date:

10-Feb-2013

Comp. Date:

09-Feb-2016

06
Transformers replacement for King Fahd military medical center (#433/28/3)

Replacement of about 107 transformers ,H1746 Switchgear- replacement of 123 LV panels- replacement of the Bus Way for connection between transformers and LV panels - disposal of 96 No. of Askarel filled transformers

Location:

King Fahd Military Medical Center in AL Zahran

Start Date:

10-Aug-2012

Comp. Date:

30-Jun-2017

07
Completed projects
Replacement of Equipment & power Connection to STC sites

Replacement of Equipement & power Connection to STC sites

Location:

KSA

Start Date:

04-Dec-2015

Comp. Date:

30-Aug-2015

01
Extension of power Overhead line to the Technical College for Boys and Girls

Execution Of Electrical Network Overhead line 25 KM long, 33 KV , Double Circuit .To Supply The Technical Colleges (Boys & Girls) In Quaiyayah

Location:

Middle Region- Kwayiya

Start Date:

01-Jul-2013

Comp. Date:

01-Aug-2014

02
Upgrade Electrical network in King Faisal Air Base

Supply and installation for Transformer, cables Generators, Frequency converter & UPS to upgrade the Existing Network and to operate at 60 Hz

Location:

Tabuk -Northern Region

Start Date:

01-May-2013

Comp. Date:

15-Mar-2015

03
Outside network OSP

Supply, Installation, testing & commissioning for the material and equipment required for Connecting power to outside network (NGN) all over the kingdom

Location:

Entire Kingdom of Saudi Arabia

Start Date:

30-Mar-2013

Comp. Date:

31-Dec-2015

04
Outside network OSP

Supply, Installation, testing & commissioning for the material and equipment required for Connecting power to outside network (NGN) all over the kingdom

Location:

Entire Kingdom of Saudi Arabia

Start Date:

30-Mar-2013

Comp. Date:

31-Dec-2015

05
Supplying of electrical power to air force site in Gabal Al Wasl in southern region

Supply, installation, testing & commissioning of UG cable & transformers to supply power to site

Location:

Assir- South region -Gabal Al Wasl

Start Date:

09-Feb-2013

Comp. Date:

30-Dec-2015

06
Civil work 2013

Civil work 2013

Location:

Entire Kingdom of Saudi Arabia

Start Date:

20-Dec-2012

Comp. Date:

30-Jun-2015

07
Install Overhead Electric Transmission at A-III in Madinah

Supply and install overhead electric transmission line
of 1000 meter along with transformer 300 KVA 33kv/480/227. rate includes SEC electrification fees and any other associated cost to SEC.

Location:

Al Madinah- North Region

Start Date:

18-Nov-2012

Comp. Date:

15-Jan-2013

08
Upgrade & develop MV electrical network (5.5 & 10.5 KV) in military factories in AL KHARJ

Replacement of MV & LV components of 21 substation, supply & Lay new MV cable network, with full supply & operation of SCADA system

Location:

AL Kharj City - Military Factories

Start Date:

07-Aug-2012

Comp. Date:

30-Oct-2015

09
Power Connection to BSC

Supply, installation, testing, commissioning of commercial SEC power connection to GSM/BTS shelter & BSC Telecom container/ building site in Kingdom

Location:

Entire Kingdom of Saudi Arabia

Start Date:

03-Apr-2012

Comp. Date:

30-Apr-2014

10
Replacement of equipment and power connection for STC existing sites

Replacement of equipment and power connection for STC existing sites

Location:

Entire Kingdom of Saudi Arabia

Start Date:

02-Apr-2012

Comp. Date:

01-May-2012

11
Supply, installation, testing & commissioning of 13.8 KV for Jizan industrial city

Design, supplying ,installation, testing & commission of 13.8 KV network for Jizan industrial city

Location:

Jizan - South Region

Start Date:

11-Mar-2012

Comp. Date:

11-Oct-2012

12
Supply commercial power to AL HAJ site at Makkah Madinah Road (Kilo 40)

Supply, installation, testing of electrical network to supply power to AL Haj site in Makkah (Kilo 40)

Location:

Makkah Madinah Main Road

Start Date:

01-Feb-2012

Comp. Date:

01-Jun-2012

13
Supplying ,installation , & testing & commission of MV cable & RMUS to connect SEC power to the site

Supplying ,installation , & testing & commission of MV cable & RMUS to connect sec power to the site

Location:

Tabuk -Northern Region

Start Date:

29-Jan-2012

Comp. Date:

29-Apr-2012

14
Civil work 2012

Civil work 2012

Location:

Entire Kingdom of Saudi Arabia

Start Date:

20-Dec-2011

Comp. Date:

20-Dec-2014

15
Upgrade electrical network for air force site in Al- Amwah in southern region

Supply, installation, testing & commissioning of OHL & UG cable & transformers to upgrade the existing electrical network at site

Location:

Assir- South region - Tareeb -Al Amwah

Start Date:

10-Nov-2011

Comp. Date:

11-Nov-2012

16
Supplying of medium & voltage equipments in boys & girls buildings

Supply, installation, testing & commissioning of 2 switchgears, 4 dry transformers, 2 generators, 2 ATS, UPS & capacitor banks

Location:

IHSA Eastern Region

Start Date:

24-Oct-2011

Comp. Date:

26-Nov-2011

17
Construction of utility network for Abou Hajar housing area

Supply, installation, testing of utility networks (electrical, water & sewage) for Abou Hajar housing in Jizan

Location:

Jizan Southern Region

Start Date:

25-Jul-2011

Comp. Date:

30-Dec-2015

18
Civil work 2011

Civil work 2011

Location:

Entire Kingdom of Saudi Arabia

Start Date:

18-May-2011

Comp. Date:

15-Aug-2012

19
Aqaba AL Baha

Delivery & installation of underground cables & RMU 13.8 KV for the electrification of Aqaba Al Baha

Location:

Assir- South Region

Start Date:

01-Dec-2010

Comp. Date:

03-Dec-2011

20
Aqaba Sheyar

Delivery & installation of underground cables &RMU 33KV for the electrification of Aqaba Sheyar

Location:

Assir- South Region

Start Date:

01-Dec-2010

Comp. Date:

03-Dec-2011

21
Maintenance of distribution network medium voltage up to 33 KV & low voltage

Maintain all activities of maintenance of distribution network medium voltage up to 33 KV & low voltage in accordance with the scope of work.

Location:

Southern Operating Areas

Start Date:

01-Jul-2010

Comp. Date:

30-Dec-2015

22
Construction supply installation for 33 KV overhead in some village in Khamis East

Delivery and installation of the electric materials and equipment (poles, transformers, cables and conductors)to supply the SEC power to the villages of Khamis East

Location:

Assir- South Region

Start Date:

21-Jun-2010

Comp. Date:

21-Jun-2012

23

hv overhead and underground cables

Ongoing projects
01 B 110 kV Connection Cable in Al Ra’idah Housing Complex Project (RHCP) Jeddah

perform the Works in Al Ra'ldah Housing Complex Project (RHCP) unless otherwise stated the Contractor shall provide the required resources to effectively manage the works Including all Manpower, and equipment necessary for the completion of the Works within the time limit specified in the Contract.

Location:

Jedah

Start Date:

31-Dec-2015

Comp. Date:

01-Nov-2017

01
Installation of 110kv underground cable for 110 -13.8kv Al-Naseem substation -Makkah

Design, engineer, construct, test, install, quality management, factory inspection/test, transport, commission, procure, supply and deliver all equipment and materials to site and all associated work to put into services for Installation of 110kv U/G Cables For 110/13.Bkv Al-Naseem Substation Makkah North BSP to MPS substation Makah

Location:

Makah

Start Date:

18-Oct-2015

Comp. Date:

18-Oct-2017

02
Installation of 110KV U/G Cable for 110/13.8 KV SARI S/S JEDDAH

design, engineer, construct, test, install, quality management, factory inspection/test, transport, commission, procure, supply and deliver all equipment and materials to site and all associated WORK to put into services for Installation Of 110kv U/G Cables For 110/13.Bkv Sari Substation Makkah North BSP to MPS substation Jeddah In accordance with the Scope of Work described In Schedule "B" of this Contract and Technical Specification

Location:

Jedah

Start Date:

18-Oct-2015

Comp. Date:

18-Oct-2017

03
Installation of 110kv U/G Cables From 380/110kv Makah North BSP to MPS substation Makah

design, engineer, construct, test, install, quality management, factory inspection/test, transport, commission, procure, supply and deliver all equipment and materials to site and all associated WORK to put into services for Installation of 110kv U/G Cables From 380/110kv Makah North BSP to MPS substation Makah In accordance with the Scope of Work described In Schedule "B" of this Contract and Technical Specification

Location:

Mekkah

Start Date:

18-Oct-2015

Comp. Date:

18-Oct-2017

04
Interconnection of 380/110kv Khaldiyah BSP with 110 KV Jeddah Network

Design, supply, Installation, testing and commissioning of 110 KV, 1200mm², XLPE underground power cable circuits from 380/110KV Al Khaldiyah BSP to Transition Joints, Khaldiyah BSP to remote end substations and NFOC from Al Khaldiyah BSP to remote end 110KV Substation in mini trench as per connection diagram

Location:

Jeddah

Start Date:

28-Jul-2015

Comp. Date:

27-Jun-2017

05
Installation of 110kv U/G Cables For 110/13.8kv University-4 Substation & Reinforcement Of 110/13.8kv university-3 Substation Jeddah

110/13.8 KV University-4 Substation is required to be constructed under another contract and new substation will be feed from 380/110KV Al Adel BSP & Al Jamia BSP. Installation of 110 KV XLPE, circuits each having (3x1c´1200mm²) UG XLPE cables and 96 core Nonmetallic Fiber Optic cable (NFOC) and Reinforcement of Existing 110/13.8KV University-3 Substation by replacing existing 630mm² XLPE cable circuits feeding to University-3 S/S by 1200mm² XLPE cable

Location:

Jeddah

Start Date:

12-Apr-2015

Comp. Date:

11-Jul-2016

06
Completed projects
Extension of Power Overhead line to the Technical College for Boys and Girls

Execution of Electrical Network overhead line 25 KM long, 33 KV , Double Circuit .to Supply The Technical Colleges (Boys & Girls) In Quaiyayah

Location:

Middle Region- Kwayiya

Start Date:

01-Jul-2013

Comp. Date:

01-Aug-2014

01
Laying Cable 132KV Tabouk 5 & King Faisal Unvirsty

Laying High Voltage Cables 132 KV between Tabuk 5 Substation and King Faisal University

Location:

Tabuk -Northern Region

Start Date:

20-May-2013

Comp. Date:

30-Apr-2014

02